Thomaston - Stumpf Warner

PROJECT DETAILS

About the project: Connecticut Water will replace about 1,625 feet of existing 6”pipe with 8” ductile iron pipe. This project will increase available water flow to the area and improve system reliability and fire protection.  Three fire hydrants will be replaced as part of the project, along with connections to 35 homes and businesses.

Location:  Stumpf Avenue and Warner Lane, Thomaston

Approximate Start Date:  August 15, 2022

Approximate Completion Date:  October 31, 2022

Work Hours: 7:00am – 4:30pm, Monday – Friday

Any planned necessary service interruptions will be communicated directly to impacted customers at least 24 hours prior to the interruption.

Please make sure we have your up-to-date contact information by calling 1-800-286-5700 or updating online at ctwater.com/notifications.

Project letter mailed to customers

During the project, we will also be replacing our portion of the water service line that runs from our water main toward the curb line.  It may be necessary to briefly interrupt your water service during that time.  We will notify you at least 24 hours in advance of planned interruptions to plan accordingly.  Most interruptions are brief, lasting less than a few hours. It is not necessary that anyone be present at the time of the replacement.

Please use caution in the construction work zone.  Our work will involve trenches that may be up to 6 feet deep.  Our contractor will take all required safety measures to ensure the work area is safe, including appropriate signs, barricades and traffic control.  At times traffic lanes may be restricted.  Restoration work, such as repaving of driveway aprons and restoration of grass along the curb line, will take place when the project is fully completed.  Due to seasonal constraints around paving and planting, the restoration work may take place several weeks after we have moved through your area.